挑战
High operator traffic was identified as a major contamination and yield risk. The client wanted to keep the clean zone tighter without major layout changes.
方案
Custom material air shower integrated with roller and lift transfer, designed to interface with existing production equipment and reduce the need for personnel to enter the core zone.
成果
•Significant reduction in personnel entry frequency
•Improved process stability feedback from customer
•System designed for future MES connection