Home/Case Studies/Precision Electronics

Precision Electronics

Electronics Assembly Line Cleanroom Upgrade

Modular ISO 7 cleanroom expansion with integrated personnel and material purification for a high-volume electronics assembly line.

Asia (reference project)ISO 7

Challenge

The client needed to upgrade an existing production area to ISO 7 while minimizing downtime and keeping material flow efficient. Traditional multi-vendor coordination was causing schedule risk.

Solution

We supplied a coordinated package: modular wall/ceiling system, personnel air showers with interlock, material pass-through with conveyor interface, and FFU layout. Design was matched to the existing building constraints.

Results

•Cleanliness target achieved and verified
•Installation completed within planned window
•Reduced personnel traffic into the clean zone
•Single documentation package simplified customer internal audit

Ready to discuss your cleanroom or automation project?

Share your requirements and our technical team will respond with a preliminary assessment.